Project: Soil Investigation of 220kV Overhead Transmission Line, Rohri - Shikarpur
Year of Execution: 2009-10

Scope:

• Drilling of boreholes, 600 meters drilling at 30 locations, upto 40m max. depth.
• Standard Penetration Test
• Undisturbed / Disturbed sampling
• Laboratory Testing
• Project Completion Time = 03 – Months

key-projects-1

_______________________________________________________________________________________________

 Project: Detailed Geotechnical, Geophysical & Geological Studies for 150MW Hydropower Project,

Located in Patrind Village of Muzaffarabad – AJK

Year of Execution:
2010


Scope:


• Drilling of boreholes, 1113 meters drilling at 20 locations, upto 150m max. depth.

• Standard Penetration Tests
• Undisturbed / Disturbed Soil and Rock Sampling
• Water Pressure Packer Test in Rock
• Field Permeability Test in Overburden
• Elastometer Test (to compute Deformation & Elastic Modulus of in Situ Rock)
• Seismic Refraction
• Investigation of Construction Material
• Geological Mapping
• Project Completion Time = 04 – Months

key-projects-2

_______________________________________________________________________________________________

 Project: Detailed Geotechnical Investigation Report of 800 KM long Iran-Pakistan Gas Pipeline Project

Year of Execution: 2011-12

Scope:

• Drilling of boreholes, 3915 meters drilling at 200 locations, up to 60m max. depth.
• Excavation of Test Pits, 1000 Nos.
• Standard Penetration Tests
• Undisturbed / Disturbed sampling
• Field Permeability Tests
• Seismic Refraction
• Resistivity Survey
• Laboratory Testing
• Project Completion Time = 05 – Months

key-projects-3

_______________________________________________________________________________________________

 Project: Detailed Geotechnical Investigation Reportn of 40MW Ashkot Hydropower Project


Year of Execution:
2013-14


Scope:

  • Drilling of boreholes, 679 meters drilling at 11 locations, up to 150m max. depth.
  • Excavation of Test Pits, 3 Nos.
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Seismic Refraction
  • Resistivity Survey
  • Water Pressure Packer Test in Rock
  • Field Permeability Test in Overburden
  • Elastometer Test (to compute Deformation & Elastic Modulus of in Situ Rock)
  • Laboratory Testing

key-projects-4

_______________________________________________________________________________________________

 Project: Detailed Geotechnical Investigation Report of 100MW Gulpur Hydropower Project At Kotli AJK.

Year of Execution: 2014

Scope:

  • Drilling of boreholes, 785 meters drilling at 14 locations, up to 125m max. depth.
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Seismic Refraction
  • Resistivity Survey
  • Detail Mapping
  • Water Pressure Packer Test in Rock
  • Grouting Test
  • Elastometer Test (to compute Deformation & Elastic Modulus of in Situ Rock)
  • Laboratory Testing

key-projects-5

_______________________________________________________________________________________________

Project: Detailed Geotechnical Investigation Report of 2 x 660 MW Coal Power Plant at Sahiwal.

Year of Execution: 2014

Scope:

  • Drilling of boreholes, 1,543 meters drilling at 52 locations, up to 45m max. depth.
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Down-hole Seismic Test
  • Plate Load Testing, 6 Nos.
  • Laboratory Testing
  • Comprehensive Geotechnical Investigation Report.

 key-projects-6

 

_______________________________________________________________________________________________

Project: Screw Pile load testing of 100 MW Solar Power Plant at Bahawalpur.

Year of Execution: 2014
 

Scope:
Testing of 85 Nos. Screw Piles.


A) Compression test
B) Uplift test
C) Horizontal test
D) Submerge condition

key-projects-7