Geo-Technical Investigation &
Laboratory Testing

Best Construction Facilities Available For Valuable Clients

Do You Have A Construction Project We Can Help With?

List of Key Projects (Geotechnical Investigations)

Project: Geotechnical Investigation of 30MW Ghowari Hydropower Project Ghowari Ghanche (GBP).

Year of Execution: 2022

Scope:

  • Drilling of boreholes, 12Nos-382.5 meters drilling
  •  Excavation of Test pits, 11Nos- 20.7 meters excavation
  • Earth Resistivity Survey, 4Nos
  •  Seismic Profiles: 05Nos
  •  Laboratory Testing
  •  Factual Report Writing
  •  Project Completion Time = 4 – Months

Project: Design Review/Vetting of Greater Karachi Bulk Water Supply Water Scheme K-IV, Pakistan

Year of Execution: 2019

Scope:

  • Drilling of boreholes, 354 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Rock Coring
  • Borrow pit excavation
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 06 – Months

Project: Geotechnical Investigations For 150mw Sharmai Hydro Power Plant In Khyber Pakhtunkhwa Province

Year of Execution: 2018

Scope:

  • Drilling of boreholes, 1072 meters drilling
  • Standard Penetration Tests
  • CPTU Test
  • Rock Coring
  • Undisturbed / Disturbed sampling
  • Excavation of Test Pits
  • Lugeon Test
  • Seismic Refraction Survey
  • Geodetic Survey
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 07 – Months

Project: Geotechnical Investigation for EXPO Centre, Quetta.

  • Year of Execution: 2022
  • Scope:
     
  • Drilling of boreholes, 30Nos-490 meters drilling
  • Excavation of Test pits, 15Nos- 22.5 meters excavation
  • Borrow Areas Bulk Soil Sample Collection, 4Nos
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Factual Report Writing
  • Project Completion Time = 2 – Months

Project: Geotechnical Investigation of bridges (Shagram, Phunkia, Bonyo and Budia Kamar) in Kalam, District Swat, Pakistan

Year of Execution: 2018

Scope:

  • • Drilling of boreholes, 90 meters drilling
    • Standard Penetration Tests
    • Undisturbed / Disturbed sampling
    • Rock Coring
    • Excavation OF observation Pits-08 Nos
    • Laboratory Testing
    • Report Writing
    • Geological Mapping
    • Natural Exposure Logging-09 Nos
    • Low Strain Integrity Test
    • Project Completion Time = 02 – Months

Project: Consultancy Services Relating to a Geotechnical Survey in Pakistan- 824 KM (Turkmenistan-Afghanistan-Pakistan-India (TAPI) Gas Pipeline Project)

Scope:

  • Drilling of boreholes, 240 No’s. 3105 meters drilling
  • Excavation of Trial Pits, 793 No’s
  • Electrical Resistivity Survey, 963 Locations
  • Pressure Meter Test, 32 No’s
  • Cone Penetration Test, 36 No’s
  • Standard Penetration Tests, 1844 No’s
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 04 – Months

Project: Geotechnical Investigation of 800 KM long Iran-Pakistan Gas Pipeline Project

Scope:

  • Drilling of boreholes, 3915 meters drilling at 200 locations, up to 60m max. depth.
  • Excavation of Test Pits, 1000 Nos.
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Field Permeability Tests
  • Seismic Refraction
  • Resistivity Survey
  • Laboratory Testing
  • Project Completion Time = 05 – Months

Project: NTDC CONTRACT NO. TLS-06R-2021 Sub‐Soil Investigation of 220kV D/C T/L from 500kV Nowshera Grid Station to 220kV Swabi Grid Station (Approx. 55 Km)

Year of Execution: 2021-2022
Scope:

  • Drilling of boreholes, 49Nos-820 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Soil Resistivity Tests-49Nos
  • Geological Mapping
  • Report Writing
  • Project Completion Time = 06 – Months

Project: NTDC CONTRACT NO. TLS-07-2021 Sub-Soil Investigation of 220kV D/C Twin Bundled T/Line from 500/220kVFaisalabad Grid Station to 220kV Lalian Grid Station (Approx. 56km)–

Year of Execution: 2021
Scope:

  • Drilling of boreholes, 47Nos-785 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Soil Resistivity Tests-47Nos
  • Report Writing
  • Project Completion Time = 02 – Month

Project: DASU 5010042-001-EMB Sub-Soil Investigation of 765KV OHTL DASU – ISLAMABAD WEST

Year of Execution: 2019

Scope:

  • Drilling of boreholes, 867 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Rock Coring
  • Laboratory Testing
  • Report Writing
  • Geological Mapping
  • Project Completion Time = 05 – Months

Project: NTDC CONTRACT TLC-03-2017 (LOT-II) Sub-Soil Investigation of 500KV OHTL GUDDU–MUZAFFARGARH

Scope:

  • Drilling of boreholes, 590 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 02 – Months

Project: NTDC Tender No.: TLS-02-2017 For Sub-Soil Investigation of 500kV and 220kV D/C T/Lines under NTDC’s Own Resources

Scope:

  • Drilling of boreholes, 3840 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 07 – Months

Project: Geotechnical Investigation for Matiari – Lahore 660kV HVDC T/L Project in Pakistan

Scope:

  • Drilling of boreholes, 1659 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 07 – Months

Subsoil Investigation for 500 kV Quad Bundle Double Circuit T/L Starting from Thar & Terminating at Matiari

Scope:

  • Drilling of boreholes, 1180 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 05 – Months

Project: Subsoil Investigation for 220 kV T/L In-Out Ghazi Road Grid Station

Year of Execution: 2016-17

Scope:

  • Drilling of boreholes, 545 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 03 – Months

Project: Subsoil Investigation for 220 kV T/L In-Out Ghazi Road Grid Station

Year of Execution: 2015-16
Scope:

  • Drilling of boreholes, 545 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 03 – Months

Project: Subsoil Investigation for 220 kV Uch Sibbi T/L

Year of Execution: 2015-16

Scope:

  • Drilling of boreholes, 1150 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 07 – Months

Project: Subsoil Investigation for 500kV Double Circuit Quad Bundle T/L from Neelum-Jhelum to Domeli

Year of Execution: 2014-15

Scope:

  • Drilling of boreholes, 200 meters drilling
  • Excavation of Test Pits
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Project Completion Time = 1.5 – Months

Project: Subsoil Investigation for 220kV T/L from New Kot Lakhpat-Ghazi Road at New Lahore 500/220kV Substation (Lot-2A)

Year of Execution: 2012-13

Scope:

  • Drilling of boreholes, 860 meters drilling
  • Excavation of Test Pits
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Project Completion Time = 01 – Month

Project: Soil Investigation of 220kV Overhead Transmission Line, Rohri - Shikarpur

Year of Execution: 2009-10
Scope:

  • Drilling of boreholes, 600 meters drilling at 30 locations, upto 40m max. depth.
  • Standard Penetration Test
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Project Completion Time = 03 – Months

Project: Geotechnical Investigation of HVDC Converter Station Nowshera, KPK & Survey of Drainage Channel

Year of Execution: 2019-20

Scope:

  • Drilling of boreholes, 275 meters drilling
  • Standard Penetration Tests
  • CPTU Test
  • Rock Coring
  • Undisturbed / Disturbed sampling
  • Excavation of Test Pits
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 03 – Months

Project: Geotechnical, Geophysical & Geological Studies for 150MW Hydropower Project Located in Patrind Village of Muzaffarabad – AJK

Scope:
Drilling of boreholes, 1113 meters drilling at 20 locations, upto 150m max. depth.
Standard Penetration Tests
Undisturbed / Disturbed Soil and Rock Sampling
Water Pressure Packer Test in Rock
Field Permeability Test in Overburden
Elastometer Test (to compute Deformation & Elastic Modulus of in Situ Rock)
Seismic Refraction
Investigation of Construction Material
Geological Mapping
Project Completion Time = 04 – Months

Project: Geotechnical, Geophysical & Geological Studies for 150MW Hydropower Project Located in Patrind Village of Muzaffarabad – AJK

Scope:

  • Drilling of boreholes, 600 meters drilling at 30 locations, upto 40m max. depth.
  • Standard Penetration Test
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Project Completion Time = 03 – Months