GeoTechnical Investigation and Engineering Services

Best GeoTechnical Surveyor in Pakistan

Do You Have A Construction Project We Can Help With?

List of Key Projects (Geotechnical Services)

Project: Geotechnical Investigation of 30MW Ghowari Hydropower Project Ghowari Ghanche (GBP).

Year of Execution: 2022

Scope:

  • Drilling of boreholes, 12Nos-382.5 meters drilling
  •  Excavation of Test pits, 11Nos- 20.7 meters excavation
  • Earth Resistivity Survey, 4Nos
  •  Seismic Profiles: 05Nos
  •  Laboratory Testing
  •  Factual Report Writing
  •  Project Completion Time = 4 – Months

Project: Design Review/Vetting of Greater Karachi Bulk Water Supply Water Scheme K-IV, Pakistan

Year of Execution: 2019

Scope:

  • Drilling of boreholes, 354 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Rock Coring
  • Borrow pit excavation
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 06 – Months

Project: Geotechnical Investigations For 150mw Sharmai Hydro Power Plant In Khyber Pakhtunkhwa Province

Year of Execution: 2018

Scope:

  • Drilling of boreholes, 1072 meters drilling
  • Standard Penetration Tests
  • CPTU Test
  • Rock Coring
  • Undisturbed / Disturbed sampling
  • Excavation of Test Pits
  • Lugeon Test
  • Seismic Refraction Survey
  • Geodetic Survey
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 07 – Months

Project: Geotechnical Investigation for EXPO Centre, Quetta.

  • Year of Execution: 2022
  • Scope:
     
  • Drilling of boreholes, 30Nos-490 meters drilling
  • Excavation of Test pits, 15Nos- 22.5 meters excavation
  • Borrow Areas Bulk Soil Sample Collection, 4Nos
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Factual Report Writing
  • Project Completion Time = 2 – Months

Project: Geotechnical Investigation of bridges (Shagram, Phunkia, Bonyo and Budia Kamar) in Kalam, District Swat, Pakistan

Year of Execution: 2018

Scope:

  • • Drilling of boreholes, 90 meters drilling
    • Standard Penetration Tests
    • Undisturbed / Disturbed sampling
    • Rock Coring
    • Excavation OF observation Pits-08 Nos
    • Laboratory Testing
    • Report Writing
    • Geological Mapping
    • Natural Exposure Logging-09 Nos
    • Low Strain Integrity Test
    • Project Completion Time = 02 – Months

Project: Consultancy Services Relating to a Geotechnical Survey in Pakistan- 824 KM (Turkmenistan-Afghanistan-Pakistan-India (TAPI) Gas Pipeline Project)

Scope:

  • Drilling of boreholes, 240 No’s. 3105 meters drilling
  • Excavation of Trial Pits, 793 No’s
  • Electrical Resistivity Survey, 963 Locations
  • Pressure Meter Test, 32 No’s
  • Cone Penetration Test, 36 No’s
  • Standard Penetration Tests, 1844 No’s
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 04 – Months

Project: Geotechnical Investigation of 800 KM long Iran-Pakistan Gas Pipeline Project

Scope:

  • Drilling of boreholes, 3915 meters drilling at 200 locations, up to 60m max. depth.
  • Excavation of Test Pits, 1000 Nos.
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Field Permeability Tests
  • Seismic Refraction
  • Resistivity Survey
  • Laboratory Testing
  • Project Completion Time = 05 – Months

Project: NTDC CONTRACT NO. TLS-06R-2021 Sub‐Soil Investigation of 220kV D/C T/L from 500kV Nowshera Grid Station to 220kV Swabi Grid Station (Approx. 55 Km)

Year of Execution: 2021-2022
Scope:

  • Drilling of boreholes, 49Nos-820 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Soil Resistivity Tests-49Nos
  • Geological Mapping
  • Report Writing
  • Project Completion Time = 06 – Months

Project: NTDC CONTRACT NO. TLS-07-2021 Sub-Soil Investigation of 220kV D/C Twin Bundled T/Line from 500/220kVFaisalabad Grid Station to 220kV Lalian Grid Station (Approx. 56km)–

Year of Execution: 2021
Scope:

  • Drilling of boreholes, 47Nos-785 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Soil Resistivity Tests-47Nos
  • Report Writing
  • Project Completion Time = 02 – Month

Project: DASU 5010042-001-EMB Sub-Soil Investigation of 765KV OHTL DASU – ISLAMABAD WEST

Year of Execution: 2019

Scope:

  • Drilling of boreholes, 867 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Rock Coring
  • Laboratory Testing
  • Report Writing
  • Geological Mapping
  • Project Completion Time = 05 – Months

Project: NTDC CONTRACT TLC-03-2017 (LOT-II) Sub-Soil Investigation of 500KV OHTL GUDDU–MUZAFFARGARH

Scope:

  • Drilling of boreholes, 590 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 02 – Months

Project: NTDC Tender No.: TLS-02-2017 For Sub-Soil Investigation of 500kV and 220kV D/C T/Lines under NTDC’s Own Resources

Scope:

  • Drilling of boreholes, 3840 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 07 – Months

Project: Geotechnical Investigation for Matiari – Lahore 660kV HVDC T/L Project in Pakistan

Scope:

  • Drilling of boreholes, 1659 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 07 – Months

Subsoil Investigation for 500 kV Quad Bundle Double Circuit T/L Starting from Thar & Terminating at Matiari

Scope:

  • Drilling of boreholes, 1180 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 05 – Months

Project: Subsoil Investigation for 220 kV T/L In-Out Ghazi Road Grid Station

Year of Execution: 2016-17

Scope:

  • Drilling of boreholes, 545 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 03 – Months

Project: Subsoil Investigation for 220 kV T/L In-Out Ghazi Road Grid Station

Year of Execution: 2015-16
Scope:

  • Drilling of boreholes, 545 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 03 – Months

Project: Subsoil Investigation for 220 kV Uch Sibbi T/L

Year of Execution: 2015-16

Scope:

  • Drilling of boreholes, 1150 meters drilling
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 07 – Months

Project: Subsoil Investigation for 500kV Double Circuit Quad Bundle T/L from Neelum-Jhelum to Domeli

Year of Execution: 2014-15

Scope:

  • Drilling of boreholes, 200 meters drilling
  • Excavation of Test Pits
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Project Completion Time = 1.5 – Months

Project: Subsoil Investigation for 220kV T/L from New Kot Lakhpat-Ghazi Road at New Lahore 500/220kV Substation (Lot-2A)

Year of Execution: 2012-13

Scope:

  • Drilling of boreholes, 860 meters drilling
  • Excavation of Test Pits
  • Standard Penetration Tests
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Project Completion Time = 01 – Month

Project: Soil Investigation of 220kV Overhead Transmission Line, Rohri - Shikarpur

Year of Execution: 2009-10
Scope:

  • Drilling of boreholes, 600 meters drilling at 30 locations, upto 40m max. depth.
  • Standard Penetration Test
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Project Completion Time = 03 – Months

Project: Geotechnical Investigation of HVDC Converter Station Nowshera, KPK & Survey of Drainage Channel

Year of Execution: 2019-20

Scope:

  • Drilling of boreholes, 275 meters drilling
  • Standard Penetration Tests
  • CPTU Test
  • Rock Coring
  • Undisturbed / Disturbed sampling
  • Excavation of Test Pits
  • Laboratory Testing
  • Report Writing
  • Project Completion Time = 03 – Months

Project: Geotechnical, Geophysical & Geological Studies for 150MW Hydropower Project Located in Patrind Village of Muzaffarabad – AJK

Scope:
Drilling of boreholes, 1113 meters drilling at 20 locations, upto 150m max. depth.
Standard Penetration Tests
Undisturbed / Disturbed Soil and Rock Sampling
Water Pressure Packer Test in Rock
Field Permeability Test in Overburden
Elastometer Test (to compute Deformation & Elastic Modulus of in Situ Rock)
Seismic Refraction
Investigation of Construction Material
Geological Mapping
Project Completion Time = 04 – Months

Project: Geotechnical, Geophysical & Geological Studies for 150MW Hydropower Project Located in Patrind Village of Muzaffarabad – AJK

Scope:

  • Drilling of boreholes, 600 meters drilling at 30 locations, upto 40m max. depth.
  • Standard Penetration Test
  • Undisturbed / Disturbed sampling
  • Laboratory Testing
  • Project Completion Time = 03 – Months

As a leading Geotechnical surveyor Pakistan, we have been providing Geotechnical investigation and engineering services all over Pakistan since 1992. As a private sector Geotechnical investigation company in Pakistan, we drive our business forward by providing quality, reliable, competitive and timely services. Client satisfaction is our top most priority which is followed by addressing engineering and technical problems with innovative solutions.